Bongaigaon Refinery, Technology with Ecology at Heart






 Facilities Supporting the   The Guwahati–Siliguri Pipeline initially designed to uplift product from Guwahati Renery with a capacity of 0.481 MMTPA, was
 Associated Facilities
            enhanced multiple times to aid the growing rening operations at Bongaigaon. Bongaigaon LPG BP, started in 1982, as a single
 Refining Process
            carousel (24 Gun), Double-shift Operating Bottling Plant with a 60 TMTPA capacity, supplying packed LPG cylinders to eastern Assam,
            Meghalaya, and Bhutan.
 Bongaigaon  Renery  operates  a  single
 Gas Turbine (GT) of 20 MW capacity for
 power generation. It also has three Steam
 Turbine  Generators  (STG),  each  with  a
 16.5  MW  capacity,  and  facilities  for
 importing power from the state electricity
 grid, with a maximum draw of 14 MW.




















































                                                                     Gas Booster Compressor



 Gas Turbine Facility




 138 IndianOil Reneries                                                                                                      IndianOil Reneries  139