Barauni Refinery, Technology with Ecology at Heart






 1999  2000                                                                      2007
                      2006                                                                                                         2008
 Þ Wax Hydro Finishing Unit   Revamped AVU-3 from                              Þ Modernization of Coke
 commissioned  1.0 to 2.0 MMTPA    Bitumen                                         Cutting Kelly System of                     Facilities created

 Þ Haldia-Barauni crude   commissioned  production                                 Coker-A for enhancing                            for ATF
 pipeline commissioned  commences                                                  operational reliability                        production

 Þ OSHAS-18001 certication                                                    Þ New LPG Treatment Unit
 by M/s DNV                                                                        (LTU) commissioned










 2002-03
                2009                                                                   2010
 Þ High Sulphur Crude processing commences

 Þ Hydrogen Generation Unit (HGU) commissioned under Barauni Renery Expansion Project  Þ TPM Excellence Award in   Þ MS (Motor Spirit) quality up-
                  Category 'A'                                                           gradation project
 Þ Resid Fluid Catalytic Cracking Unit (RFCCU) of 1.4 MMTPA capacity commissioned        commissioned to produce BS-III
               Þ Advanced Process Controller
 Þ Diesel Hydrotreating Unit (DHDT) of capacity of 2.2 MMTPA commissioned                compliant  MS with capacity of
                  (APC) commissioned in AVUs                                             700 TMTPA MS production
 Þ Sulphur Recovery Unit (SRU) commissioned at a capacity of 2 X 40 MT/day sulphur production  to maximize LPG & SKO
                                                                                     Þ New Hydrogen Generation Unit (HGU-
 Þ Gas Turbine-2 of 20 MWH commissioned                                                  2) with capacity of 20 TMTPA hydrogen
                                                                                         production for supply of hydrogen to MSQ
 Þ Amine Regeneration Unit (ARU) commissioned
                                                                                         Unit








             2012                                                  2013

 2004  2005  Þ Award for Excellence in Consistent TPM             Þ Sona  Kaizen  Award  2013  received  at  13   TPM  National  Conference,
                                                                                                                   th
               Commitment
 Supply of High   BS-III HSD dispatch                                Chennai on Kaizen Theme, "Modication of Extraction cum Condensing
 Octane Xtra   kicks off through   Þ First rake of Petrochemical Naphtha   Turbine to Back Pressure Turbine in STG-I (Russian Make of Barauni Renery)
 Premium Petrol   Barauni -Kanpur   dispatched for Panipat Naphtha   Þ First Prize in Oil & Gas Conservation Fortnight Award-2012 for Furnace/
 commences  Pipeline ( BKPL)  Cracker Complex (PNCC)                 Boiler Insulation Effectiveness
            Þ TPI (Facility II) inaugurated as Phase I            Þ Second  Prize  in  Jawaharlal  Nehru  Centenary  Awards  2012-13  for
               of ETP Modernization Project                          improvement in Specic Energy Consumption

            Þ RO based DM Plant inaugurated