Page 85 - CTB_Engilsh_Web_Version1
P. 85

Barauni Refinery, Technology with Ecology at Heart






 2015
 2016          2019

 Þ Golden Jubilee Celebration in the presence of
 Mr. Giriraj Singh, Union Minister of State, Ministry   1 MW solar   Þ Conned Space Bio-remediation facility inaugurated for faster remediation of residual oily sludge
 of Micro, Small and Medium Enterprises  photovoltaic
              Þ Hon'ble Prime Minister of India, Mr. Narendra Modi laid the foundation stone of new AVU Unit
 Þ Inauguration of Modernized Bio Treatment Plant   system   under Barauni Renery Expansion Project and the Hydrotreating Unit
 th
 Þ First prize in the breakthrough section of the 25  Kaizen   inaugurated
              Þ New Prime G + Unit commissioned for production of BS-VI grade MS
 Seminar Co-Competition in July
              Þ New ARU (908) of capacity 40 tons/hr comissioned to cater to amine requirement of PrimeG+ units (both
                  old & new)

              Þ Production and certication of the rst batch of BS-VI HSD ex-BR
              Þ Production and certication of BS-VI MS on October 24
 2017
              Þ Modernization of QC lab with latest state-of-art equipments
 Þ A New Bitumen Unit with Biturox Technology commissioned on January 16  Þ A herbal garden set-up in the Township on World Environment Day

 Þ Dispatch of BS-IV compliant diesel and petrol   Þ First  ever  Industrial  Conclave  organized  at  Begusarai  to  re-establish  Barauni  as  the  “Industrial  Capital  of  Bihar”,  with
                  participation of senior executives NTPC - Barauni, HURL, Oil India, HPCL, BPCL, Barauni Dairy and IndianOil ofces
 Þ Facility to load LS crude in rakes utilizing the black oil gantry developed crude oil dispatched to
 Guwahati Renery

 Þ DHDT unit revamped and capacity increased from 2.9 MMTPA to 3.3 MMTPA.

 Þ Prime G quality revamp successfully completed to enhance BS-IV MS production as well as to facilitate HS crude processing

 Þ Honored with the Energy Efcient Unit Award for Excellence in Energy Management at the 18th National Energy Award

 Þ 1 MW Ground Mounted Solar Park inaugurated
                                                2020                                                                                 2021
 Þ VG-40 grade bitumen produced and rst TT loading of VG-40 commenced from December 21
                                                    st
                                               Þ 1  batch of Ethanol Blended Motor                                           Þ Dispatch of 1st
                                                   Spirit (EBMS) dispatched to                                                   batch of premium
                                                   Barauni Marketing Terminal on                                                 Grade petrol, XP-
                                                                      st
                                                   January 23 and 1 tank truck                                                   100 to Barauni
                                                   loaded with EBMS agged off on
                                                                                                                                 marketing
                                                   January 24
 2018                                                                                                                            terminal
                                               Þ IndianOil board approved
 Þ RO Plant commissioned  for fullling the IndianOil's commitment towards sustainable development   Renery Expansion Project  from 6   Þ Commissioning
 and reducing the consumption of fresh water by about 100 m³ / hr.   to 9 MMTPA at an estimated cost                             of direct rake
                                                   of INR  13779 crore  (+- 10%)                                                 unloading facility
 Þ Won the NSCI Suraksha Puraskar in Category-A for the year 2017
                                                   approved on January 30                                                        of MS and HSD
 Þ First  ever  external  Reformate  rake  dispatched  to  Guwahati  &  Gujarat  Renery  in  October  &                         to Barauni
                                               Þ Commissioning of NHT-CCR in
 November respectively                                                                                                           marketing
                                                   November-December
                                                                                                                                 terminal




 82 IndianOil Reneries                                                                                                       IndianOil Reneries  83
   80   81   82   83   84   85   86   87   88   89   90