Page 70 - CTB_Engilsh_Web_Version1
P. 70

Barauni Refinery, Technology with Ecology at Heart






               Associated Facilities
                                                                                                             Green Initiative
               Robust Infrastructure
                                                                                        In line with the corporate mandate of achieving operational
               The  Barauni  Renery  is  supported  by  a  robust  network  of         Net-Zero, Barauni Renery developed facilities in 2023 to
               associated facilities, including pipelines, marketing terminals,         receive natural gas through pipeline from Dhamra port.
               and power generation units.

               Key  pipeline  infrastructure  includes  the  Barauni-Kanpur-
               Lucknow  Product  Pipeline  (BKPL)  and  TOPs  of  BKPL  at  Patna
               connected  with  Patna-Motihari-Baitalpur  Pipeline  (Domestic)
               and  Motihari  to  Amlekhganj  International  Product  Pipeline,
               Paradip-Haldia-Barauni  Crude  Pipeline  (PHBPL)  and  Haldia-
               Barauni (HB section) Product Pipeline. The Barauni Marketing
               Terminal, commissioned on January 30, 1993, serves as a vital
               distribution hub.

               In addition to supplying LPG to Haldia-Durgapur section, this
               pipeline also supplies LPG to Nepal Oil Corporation through the
               Barauni-Muzaffarpur  section  of  the  pipeline.  Through  this
               facility, LPG can also be supplied back to Barauni Renery from
               PHDPL in case of LPG shortage during planned shutdowns or
               unit interruptions.

























                                                                                      For power generation, the renery is equipped with gas turbines,
                            Unique Technical Information                              steam  turbo  generators,  boilers,  Heat  Recovery  Steam

                                                                                      Generators, and Demineralization (DM) plants. The tank wagon
                  A  new  LPG  transfer  facility  from  Barauni  Renery  to         loading gantry is designed to handle white oil, black oil, and
                  Paradip-Haldia-Durgapur LPG pipeline commissioned on                ultra-light oils, while the LPG bulk loading tank truck has multiple
                  November 02, 2023 reduces carbon footprints caused by               bays. The Efuent Treatment Plant (ETP) provides both physical
                  transportation of LPG through Tanker Trucks (TTs).                                                                                                                                                               An aerial view of Barauni Renery
                                                                                      and biological treatment.





                68 IndianOil Reneries                                                                                                                                                                                                                                                          IndianOil Reneries  69
   65   66   67   68   69   70   71   72   73   74   75