Gujarat Refinery, Technology with Ecology at Heart






 Growth Timeline  1978-79                                                         1982

               Secondary processing                                              Þ To recover high value products from the residue, the
               facilities, consisting of a                                           secondary processing facilities consisting of Fluidized
 1961          Fluidized Catalytic                                                   Catalytic Cracking Unit (FCCU) of 1.0 MMTPA capacity
 1965-66       Cracking Unit (FCCU) with a                                           along with a Feed Preparation Unit (FPU-1) of 1.7
 Following the conclusion of an
 Indo-Soviet agreement in 1961   The rst million tonne Crude Distillation Unit    capacity of 1.0 MMTPA, along   MMTPA capacities, were commissioned in December
 February, a site for the   commissioned for trial production on October   with a Feed Preparation Unit   Þ Pilot Distillation Facilities (PDF) for the production of N-
 establishment of a 2 million tonne   11, 1965. The throughput further increased by   (FPU-1) with a capacity of 1.7   heptane & Light Aluminum Rolling Oils (LARO) set up
 oil renery in Gujarat at Koyali near   20% beyond the designed capacity in January   MMTPA, commissioned in December. By
 Vadodara selected on April 17. The   1966  1980-81 this unit started processing Bombay High
 Soviet and Indian engineers signed a   Crude in addition to imported crudes. It was for the
 contract in October for the preparation of the   rst time in Indian petroleum industry that Indian
               engineers independently handled such a big project
 project report jointly







                1993-94                                                 1999
 1966  1967

               To enable the absorption of increased                   Þ India's rst Diesel Hydrodesulfurization Unit (DHDS), commissioned
 Dr. S. Radhakrishnan, the then   The third 1.0 MMTPA Crude   indigenous crude, the crude processing   in June. Additionally, the MTBE Unit commissioned in September to
 President of India, dedicated the   Distillation Unit (AU-3)   capacity of the renery was further increased   eliminate Lead in Motor Spirit (MS)
 renery to the nation with the   commissioned in September to   to 9.5 MMTPA. In 1993-94, Gujarat Renery
 commissioning of second Crude   process Ankleshwar & North   commissioned the country’s rst   Þ Conceptualized and commissioned South - East Asia’s largest
                                                                           centralized Efuent Treatment Plant in June
 Distillation Unit and Catalytic   Gujarat crudes thus raising the   Hydrocracker Unit with a capacity of 1.2
 Reforming Unit on October 18  rening capacity to 3.0 MMTPA  MMTPA, designed to convert the heavier ends   Þ Atmospheric Distillation Unit-5 commissioned in September.
               of crude oil into high-value, superior products             Capacity augmented to 13.7 MMTPA making it the largest PSU
                                                                           renery of the country








                2004                                                                                              2010-11
 1968  1974-75  World's largest Single Train                                                                     The Residue Upgradation

               Linear Alkyl Benzene (LAB) Plant                                                                  Project and MS/HSD quality
 Udex Plant commissioned for production of   By 1974-75 with in-house modications, the capacity   set up marking IndianOil's big-  improvement project
 Benzene & Toluene using feedstock available from   of the renery further increased by 40% to a level of
               ticket entry into the Petrochemicals                                                              commissioned increasing the
 CRU in December  4.2 MMTPA
               eld. The project completed  in                                                                   distillate yield by 8 to 10%
               record 23 months